Observability Spike
Status: Planned Spike Timeline: Q2-Q3 2026 Feature Specification: Infrastructure Features
Details
- Goal: Evaluate infrastructure monitoring, centralized logging, and error tracking solutions.
- Candidate Tools: Prometheus/Grafana, Elasticsearch/ELK, Sentry, ClickHouse.
- Deliverables: Cost analysis, Proof of Concept, Integration Estimate.
Timeline
- MVP Launch (Q1 2026): PostHog only
- Spike (Q2-Q3 2026): Evaluation and PoC
- Implementation (2027): Phased rollout