Implementation Checklist
Phase 1: Automated Backup System (Week 1)
- Configure encrypted S3 bucket for Vault snapshots
- Generate and escrow backup encryption key material
- Deploy automated backup job (daily at 02:00 UTC)
- Encrypt backups with AES-256-GCM
- Verify checksum validation after upload
- Enforce retention (30 daily, 12 monthly snapshots)
- Execute manual backup verification
- Configure failure alerts for backup workflow
Phase 2: Backup Restoration (Week 2)
- Document manual restoration runbook
- Implement automated restoration script
- Test snapshot decryption
- Test Vault snapshot restoration in staging
- Verify secrets accessible post-restore
- Schedule weekly restore validation
- Record RTO/RPO metrics
Phase 3: VPS Migration Workflow (Week 3)
- Implement automated VPS migration script
- Validate Vault secret retrieval during migration
- Confirm SSH key deployment on new VPS
- Confirm SMTP credential recovery
- Confirm DKIM key installation
- Send and validate post-migration test email
- Document migration procedures
- Conduct migration drill
Phase 4: High Availability Setup (Weeks 4-5)
- Provision three Vault nodes
- Configure Raft consensus storage
- Deploy PostgreSQL primary and two replicas
- Configure HAProxy/Nginx load balancer
- Verify automatic failover path
- Configure health checks (5-second interval)
- Validate audit log replication
- Measure failover time (< 30 seconds target)
Phase 5: Monitoring and Alerting (Week 5)
- Deploy Vault health monitoring script
- Scrape Prometheus metrics
- Publish Grafana dashboards
- Configure alert rules (seal status, replication lag, backup status)
- Wire notification channels (email, Slack, PagerDuty)
- Test alert delivery for every severity
- Document monitoring and escalation procedures
Phase 6: Disaster Recovery Drills (Week 6)
- Schedule quarterly drill cadence
- Document drill scenarios (vault failure, cluster loss, VPS compromise, credential compromise)
- Implement drill automation scripts
- Execute initial drill for vault server failure
- Produce drill report and share findings
- Remediate issues surfaced during drill
- Update procedures with lessons learned
Phase 7: Emergency Response Procedures (Week 6)
- Document breach response workflow
- Implement emergency secret rotation scripts
- Prepare tenant notification templates
- Test emergency seal/unseal sequences
- Test unseal key rotation workflow
- Document post-incident review process
- Train responders on emergency procedures
Phase 8: SMTP Credential Recovery Integration (Week 7)
- Integrate SMTP recovery into VPS migration job
- Validate SMTP credential decryption path
- Reconfigure MailU using recovered credentials
- Verify webmail login after recovery
- Document SMTP disaster recovery steps
- Reference SMTP recovery documentation in runbooks
- Conduct integrated SMTP recovery drill